# DEB-311: Finalize UI Architecture and Visualization Libraries

> **Jira:** [DEB-311](https://divami.atlassian.net/browse/DEB-311)  
> **Source Report:** [20260315.md](../../reports/jira/20260315.md)

- **Status:** Start
- **Assignee:** Unassigned
- **Priority:** Medium
- **Created:** 2026-03-13T14:51:01.259+0530
- **Updated:** 2026-03-13T15:09:15.770+0530

**Description:**

Analyze both Copilot kit and Simulator POC and have discussions with Venkat, Yeshwanth and Squad leads to finalize on the UI Architecture.

**Architecture Diagram:**

```mermaid
flowchart TD
    A[Evaluate CopilotKit POC<br/>DEB-308] --> C{Architecture Decision}
    B[Evaluate Simulator POC<br/>DEB-307] --> C
    C --> D[Discussion with Venkat<br/>& Squad Leads]
    D --> E{Decision}
    E -->|CopilotKit| F[Chat + Dashboard<br/>via CopilotKit]
    E -->|Custom Simulator| G[Canvas-based Dashboard<br/>Simulator]
    E -->|Hybrid| H[CopilotKit for Chat<br/>+ Simulator for Dashboard]
    F & G & H --> I[Finalize Visualization Library<br/>e.g. ECharts / Recharts / D3]
    I --> J[UI Architecture LLD Document]
```
